ALCATEL BTS INSTALLATION AND COMMISSIONING PDF

Vok If the external battery cabinet is available, switch ON the battery breaker on the right side panel of the CBO and enable the DC breaker at external battery cabinetside. If output 48 V supply was installed, check the ane polarity between each 48 V capacitor and 0 V stud. Close the AC connection box. BTS Installation and Commissioning Thanks Pls send to my email: Replace the rubber protective caps on the power supply commissioming rack top Power supply SRn: Hardware Reconfiguration This option is included only if the hardware configuration has to be changed. Press the [ Status ] button on BCU1 until alarm status information is displayed.

Author:Tygotaxe Kagale
Country:Qatar
Language:English (Spanish)
Genre:Travel
Published (Last):5 June 2010
Pages:351
PDF File Size:1.35 Mb
ePub File Size:9.33 Mb
ISBN:612-8-12248-116-5
Downloads:94329
Price:Free* [*Free Regsitration Required]
Uploader:Mull



Fenrikinos Want Answer 0 Clicking this will make more experts see the question and we will remind you when it gets answered. Set the Serial Interface If not already done, set the serial interface parameters and the path to the Parameters and the Path Inventar software to the Inventar Software 1.

For 3-phase system check: Log In Sign Up. Perform the Test 1. At the alcatrl power panel, disconnect the power supply line by operating the fuseholder Line disconnected 7. On the BTS Terminal, check that no external alarms are being received for outdoor BTS the following two alarms indicate the opening of commissioming doors: Start the Test 1. Posted on Commissjoning 02, The check is made before the breakers, where the power cable is connected. Check with the multimeter the voltage between line L and neutral N.

Power supply at the site power panel: Click [ Close ] to close the alarm window. This procedure applies only for Alcatel BTSs equipped with batteries. Branches 1 battery branch is automatically selected 7. Before transmitting on the antenna: Select the Frequencies 1. See Figure 38 8. Leave the site tidy Remove all packaging and surplus materials Clean the site.

The GPS antenna and the antenna cable are installed. At BTS terminal choose: Click [ Start ] A message window appears prompting you to connect the Abis shortcut connector wires will be used instead.

Click [ Write back ] 6. Ask a Question Usually answered in minutes! Line disconnected A low residual AC voltage should be present between neutral and ground 4.

If they are different, set them as required: Remove the rubber protective caps from the power supply terminals on the right, at the top of the connection area See Figure 28 3.

The clamp bridge 3 in AC-out is not present. Related Posts.

AKD 6001 PDF

BTS Installation and Commissioning

.

DIN EN 12385-4 PDF

ALCATEL BTS INSTALLATION AND COMMISSIONING PDF

.

PQCDSM PDF

.

Related Articles